Click one by one to know how your CONSTRUCTION will progress
SilverTape has simplified the website for easier management of your construction projects, serving as the standard operating procedure (SOP) for any construction.
Start by STAGES
Stage-III. 2D & 3D Plan Detailing Phase-2
​
Stage-IV. Hiring & Equipment's
​
18. Project Engineer.
19. Site Engineer.
20. Sub-Contractors.
21. Vendors.
22. Skilled Daily Wages Staff.
23. Unskilled Daily Wages Staff.
24. Machinery & Tools.
Stage-V. Primary Construction Material
26. Bricks & Blocks.
27. Sand, Soil, M-Sand.
28. Crushed Stone Aggregate.
29. Cement.
30. Concrete.
31. Steel (TMT).
32. Miscellaneous (primary).
Stage-VI. Building Civil Work Part-1
34. TMT Steel Work (bar bending).
35. Footing.
36. Foundation.
37. Sub-Structure.
38. Retain Wall.
39. Super-Structure.
40. Roofing.
41. Stairs & Parapet.
Stage-VII. Hardscape Civil Work Part-1: "Compound/Fencing, Main Arch, Gate, Planters, Water Bodies, Walkway, Pergola, Parking, Parking Shed, Rainwater Harvest, Bore Water Recharge etc.."
43. TMT Steel Work (bar bending).
44. Footing.
45. Foundation.
46. Sub-Structure.
47. Retain Wall.
48. Super-Structure.
49. Roofing.​​
Stage-VIII.Service Integration Part-1
51. Flood & Excess Water Bypass system.
52. Plumbing, Sludge, Storm Drain System.
53. STP or Septic Tank.
54. Landscape Irrigation System.
55. STP Excess Water Drain System.
56. Electrical Conducting.
57. Electrical HT-LT Conduiting.
58. Security System Conduiting.
59. Data & Networking Raceways, Conduiting.
60. HVAC Ducting-Conduiting.
61. Hydrant Line Piping Fire-Safety.
62. Fire Alarm Conduiting.
63. Audio & Visuals (AV) Conduiting.​
Stage-IX. Building Civil Work Part-2
65. External Window Frame.
66. External Door Frame.
67. Internal Partition.
68. Internal Window Frame.
69. Internal Door Frame.
70. Plastering & Wall Care.
71. Waterproofing.
72. Flooring.
Stage-X. Service Integration Part-2
75. Bore Water Recharge.
76. Server Room Modelling.
77. Sprinkler Fitting Fire-Safety.
78. Switch, DP, Panel Electrical.
79. Water Outlets Plumbing.
Stage-XI. Interior Part-1
81. False Ceiling.
82. Surface Coat (Wall-Fabrication).
83. Shades 1st Coat.
84. Wood Works.
85. Partitions (glass, gypsum).
86. Window Fixture.
87. Door Fixture.
Stage-XII. Hardscape & Softscape Civil Work Part-2: "Compound/Fencing, Main Arch, Gate, Planters, Water Bodies, Walkway, Pergola, Parking, Parking Shed, Rainwater Harvest, Bore Water Recharge etc.."
89. Road/Driveway.
90. Walkway/Pathway.
91. Parking Shelter.
92. Painting 1st Coat.
93. Soil Deployment.
94. Soil Treatment.
95. Plantation.
Stage-XIII. Interior Part-2
96. Fixtures of HVAC, Fire, Security, Safety, Data, Access, Fan, Switches etc...
97. Lighting Interior & Exterior.
99. Appliances.
102. Furnishings.
103. Carpets.
104. Decor Arrangements.